C6 CORVETTETRAIN HORN INSTALL
Rajiv tucked four Shocker XL bells above the air intake and found room for the 228H compressor and two-gallon tank alongside his subwoofers. Here’s where each part fits.
WILL IT FIT YOUR CORVETTE?
SHOCKER XL BELL LENGTHS
Lay the four bells out individually above the intake to see which way each one can face. A strip of cardboard cut to each length below makes a handy first check. Mark the 5-inch flare at one end and leave room at the other for the air-line elbow. Before choosing a mount, check hood clearance and make sure the flares leave the radiator’s airflow path open.
228H AIR SOURCE
Tape a 19-by-6¼-inch outline on your cargo floor, then check for 14½ inches of height with the hatch closed. The compressor needs to sit upright above the tank, as it does beside Rajiv’s speaker enclosure. Check that you can still reach the drain and air filter with the enclosure and trunk trim in place.
FROM THE TRUNK TO THE HORNS
MEASURE THE SUPPLY LINE
The tank and the horns are at opposite ends of this Corvette. Run a piece of string along the path you’re considering from the tank outlet to the air valve, following the bends the tubing would actually take. Compare that length with the 17 feet of ½-inch supply line included with the 228H before you commit to either mounting spot.
CHOOSE A SPOT FOR THE VALVE
The valve feeds a four-way splitter. From there, each bell gets its own 5/16-inch line. Measure the run to the farthest bell first, then plan four equal lengths so the bells honk together. The kit includes 10 feet of that smaller line to divide among the four bells.
Air path: Tank → ½-inch supply line → valve and splitter → four equal 5/16-inch lines → bells
Rajiv’s photos show where the horns and air source ended up. His brackets, wiring connections and exact route between the trunk and engine bay aren’t visible. For the kit’s plumbing and wiring diagrams, use the 228H manual below.

